Gym floor and cafeteria bleachers; rooftop fans and air handlers; window and flooring installation; duct work; stage lighting; plumbing rough-in complete. [...click for more]

Posted Friday, August 11, 2017
Block wall construction and plumbing in bathrooms; window replacement; work on library and classroom flooring [...click for more]

Posted Friday, August 4, 2017
Excavation for sidewalks and light pols; window installation; ceiling and wall construction in library; floor tile removal. [...click for more]

Posted Friday, July 28, 2017
Window removal and installation; cafetorium ceiling grid complete; vent and waste line rough-in [...click for more]

Posted Friday, July 21, 2017
Window installation continues; brick work complete outside new classroom; floor tile removal; new courtyard and gym lights. [...click for more]

Posted Friday, July 14, 2017
Demolition and window removal continue; new windows installed; temperature control and wiring; tile removed from several rooms. [...click for more]

Posted Friday, July 7, 2017
Wood floor demolition complete; window replacement begins; temperature control wiring and light fixture work; library asbestos removal complete. [...click for more]

Posted Friday, June 30, 2017
Demolition, floor and bleacher removal, temperature control wiring, asbestos prep work in library [...click for more]

Posted Friday, June 23, 2017
Filtering Options
Scope


Select Building
Text Search
Keyword / Phrase
Date Range
Start Date
End Date
Display Mode

footer logo
Schenevus Central School District
159 Main Street, Schenevus, NY 12155
Phone 607 638 5881 | Fax 607 638 5600
facebook
5210 Every day!
bassett healthcare network
© 2017. All Rights Reserved. Schenevus Central School District.